About the project

Solar project 70 MWp (under development)

  • Maximum installed/connection power: 70 MW (DC) / 49.3 MW (AC)
  • Specific production: 1,300 MWh/MWp/year;
  • Energy production (30 years): 2,435,740 MWh;
  • Connection: directly to the grid 110 kV using own substation
  • LCoE: 30 EURO;
  • IRR: 13%;
  • Emissions offset: 57,539 t CO2;
  • Expected operational date: 2023
  • Location: South of Romania