Solar project 750 MWp (under development)

  • Maximum installed/connection power: 350 MW (DC) / 299 MW (AC)
  • Specific production: 1,300 MWh/MWp/year;
  • Energy production (30 years): 8,310,959 MWh;
  • Connection: directly to the 110/220 kV, substation
  • LCoE: 29 EURO;
  • IRR: 19%;
  • Expected operational date: 2026
  • Location: West of Romania,Timis county, Uivar village