Solar PV 60 MWp (sold)

  • Maximum installed/connection power: 60 MW (DC) / 49.7 MW (AC)
  • Specific production: 1,300 MWh/MWp/year;
  • Energy production (30 years): 2,248,375 MWh;
  • Connection: directly to the grid 110 kV using own substation
  • LCoE: 28 EURO;
  • IRR: 20%;
  • Expected operational date: 2024
  • Location: South of Romania, Dolj county, Pielesti village