Solar PV 71 MWp (sold)

  • Maximum installed/connection power: 71 MW (DC) / 59 MW (AC)
  • Specific production: 1,300 MWh/MWp/year;
  • Energy production (30 years): 2,470,536 MWh;
  • Connection: directly to the grid 110 kV using own substation
  • LCoE: 29 EURO;
  • IRR: 18%;
  • Expected operational date: 2024
  • Location: South of Romania, Dolj county, Bratovoesti village