Solar PV 95 MWp (sold)

  • Maximum installed/connection power:  95 MW (DC) / 75 MW (AC)
  • Specific production: 1,300 MWh/MWp/year;
  • Energy production (30 years): 3,567,556 MWh;
  • Connection: directly to the 110 kV substation, using 110 kV underground cables
  • LCoE: 28 EURO;
  • IRR: 20%;
  • Expected operational date: 2024
  • Location: South of Romania, Dolj county, Dobresti village